By Peter Pan, CTO, TEFOO
We build custom Li-ion packs for medical device OEMs — ventilator packs, patient monitors, infusion pumps, handheld diagnostic devices. When customers ask about the EU Battery Regulation, they usually are not asking for a general explanation of the law. They are asking a narrower question: does it apply to our device, and are we exempt because the device is medical?
The short answer is that there is no blanket medical exemption. Regulation (EU) 2023/1542 does not have a “medical device battery” category. It has portable, industrial, LMT, EV and SLI batteries, and the obligations follow the category and the route you can document. From 18 February 2027, portable batteries incorporated in appliances must be readily removable and replaceable by the end user — unless a specific derogation applies.
This article is a route finder, not a full compliance guide. It starts with the battery category, then compares the three Article 11 routes, then applies them to ventilators, monitors, imaging devices and IVD. The goal is to help you decide the route before you freeze the enclosure.
Key Takeaways
18 February 2027 is a design deadline. Portable batteries in appliances must be removable and replaceable by the end user, with commercially available tools and instructions.
“Medical” is not a category. Most medical packs are portable: they need a QR code from 18 February 2027, but no battery passport. An industrial pack above 2 kWh does need a passport.
Article 11(2) and 11(3) are Member State derogations, not self-selected labels. Check the country where you place the device, and document the product-specific reason.
What Are the Three Article 11 Routes?
Start with the battery category, not the device label
The short answer: classify the pack before you read Article 11. “Medical” describes the application, not the battery category.
A portable battery is sealed, weighs 5 kg or less, and is not designed for industrial use or for EV, LMT or SLI applications. An industrial battery is designed for industrial use, or weighs more than 5 kg and is not an EV, LMT or SLI battery. The 2 kWh figure is strictly “greater than” and applies only inside the industrial category.
That produces some counter-intuitive results:
-
A 47.52 Wh ventilator pack is portable.
-
A 1.8 kWh hospital backup pack is industrial, but at or below 2 kWh, so no passport.
-
A 2.4 kWh fixed backup pack is industrial and above 2 kWh, so it needs a passport.
-
A 100 Wh handheld diagnostic pack is portable and needs no passport.
The passport scope is LMT batteries of any capacity, industrial batteries above 2 kWh, and EV batteries. Portable batteries never need a passport. But every battery needs a QR code from 18 February 2027 under Article 13(6). For a portable medical pack, that QR links to label information, the declaration of conformity, the Article 52(3) report where applicable, and waste information — not to a passport.
What this means: do not ask “does a medical device need a passport?” Ask “what category is this pack, and is it an industrial pack above 2 kWh?”
The default route: end-user replacement
The short answer: Article 11(1) requires the entire battery to be readily removable and replaceable by the end user at any time during the product’s lifetime.
The end user must be able to do it with commercially available tools. If a proprietary tool is needed, it must be supplied free of charge. Heat, solvents or procedures that damage the pack are not acceptable. Instructions and safety information must accompany the product. The obligation sits with the operator placing the appliance on the EU market, not automatically with the battery supplier.
Two separate obligations are often forgotten. Article 11(7) requires spare parts to remain available for at least five years after the last unit of the appliance model is placed on the market, at a reasonable and non-discriminatory price. Article 11(8) says software must not impede replacement with a compatible battery or key component.
What this means: for a portable medical pack in an appliance, assume the end-user route until you can document why a derogation applies.
The two derogations: independent professional or permanent connection
The short answer: Article 11(2) allows Member States to exempt certain appliances — including appliances designed for wet environments, professional medical imaging and radiotherapy devices, and in vitro diagnostic (IVD) devices — so that replacement can be done by an independent professional. Article 11(3) allows Member States to exempt appliances where continuity of power is necessary and a permanent connection between the appliance and the portable battery is required for safety or data integrity.
The wording matters: “Member States may exempt.” The OEM does not simply declare itself exempt. You need to check whether the Member State where you place the device applies the derogation, and you need product-specific evidence. Article 11(2) is still a design route: the battery has to be replaceable by an independent professional, and the safety reason has to be documented. Article 11(3) is narrower: it is about a permanent connection required for safety or data integrity, not about the device being medical or life-supporting in general.
The Commission’s guidelines point to life-saving, life-sustaining and safety-critical devices as the kind of cases where Article 11(3) may be relevant. That is guidance, not an automatic exemption. A pluggable or hot-swap pack can also cut the other way: if the battery is designed to be removed during use, the “permanent connection” argument becomes harder to sustain.
What this means: a derogation is a documented route with a country check, a safety rationale and a service plan — not a checkbox on a specification sheet.
Table 1 — The three Article 11 routes
| Route | Who replaces | What you must document | Typical examples |
|---|---|---|---|
| Article 11(1) — main rule | End user | Accessible compartment, commercially available tools, instructions | Patient monitor, infusion pump, handheld diagnostic |
| Article 11(2) — partial derogation | Independent professional | Wet-use, imaging/radiotherapy or IVD criterion; safety rationale; service path | Professional imaging, radiotherapy, IVD, washable device |
| Article 11(3) — safety/data-integrity exemption | No end-user or professional replacement duty | Permanent connection required for safety or data integrity; risk assessment; Member State check | Implantable, life-sustaining device with a permanent connection |
Which Route Fits Ventilators and Life-Support Devices?
Are ventilators automatically exempt?
The short answer: no. Ventilators are not in the Article 11(2) list. They may qualify under Article 11(3), but only if the permanent-connection test is met and the Member State applies the exemption.
“It is life-support” is not the legal test. The test is whether continuity of power is necessary and whether a permanent connection between the appliance and the portable battery is required for safety or data integrity. That is a product-specific argument, not a category argument.
If the argument does not hold, the default is end-user replacement. That does not have to mean a less reliable device. A dual-pack, hot-swap architecture can let one pack power the device while the other is replaced, which supports uninterrupted ventilation and the end-user route at the same time.
What this means: choose the route before you cut the enclosure tooling. A removable door and a permanently sealed pack lead to different mechanical designs, different service procedures and different evidence.
Can a removable pack support uninterrupted ventilation?
The short answer: yes, if the power architecture is designed for it. Removable does not mean unreliable.
A hot-swap design uses two packs: one powers the device while the other is removed and replaced. The BMS, connector rating, latch mechanism and IP sealing all need to be designed together. The instructions must explain the replacement procedure and the safe state during a swap. Software must not lock out a compatible pack.
Our standard 14.4 V ventilator packs include 47.52 Wh and 95.04 Wh versions, with SMBus v1.1 communication and IEC 62133-2 / UL 2054, UN 38.3 and ISO 13485 documentation. The point is not that one pack architecture is inherently compliant. The point is that the pack can support either route — the OEM still has to choose and document the legal route.
What this means: design the power architecture, not just the battery door. The two decisions are linked.
What evidence should a ventilator OEM keep?
The short answer: a Member State check, an ISO 14971 risk assessment, a route decision, a service procedure, a spare-parts plan and a QR/data package.
The risk assessment should explain why a permanent connection is required, what happens if the battery is removed during operation, and what alternatives were considered. The technical file should cross-reference the MDR requirements. The service procedure should define who is allowed to replace the pack and what tools are needed. The spare-parts plan should cover the five-year availability obligation. The QR/data package should cover the unique identifier, label data and — only if the pack is in scope — the passport.
What this means: if the file says “life-support” but does not answer the permanent-connection question, it is not yet a defensible position.
Which Route Fits Monitors, Infusion Pumps, Imaging and IVD?
Monitors, infusion pumps and handheld ultrasound
The short answer: these are usually portable, so the default is end-user replacement. “Imaging” alone does not trigger Article 11(2).
A cart-based ultrasound system can still be portable if the battery is sealed, 5 kg or less, and not designed for industrial use. The practical design questions are the same: a battery door that maintains the IP rating, captive screws, a commercially available tool, and instructions that a nurse or biomedical technician can follow.
This is where the enclosure cost shows up early. A medical device engineer described the problem in a public r/MechanicalEngineering thread:
“we’d been using a chemical weld on the case halves and now we’re looking at a gasketed door with captured screws. the BOM cost is up about $3 per unit just for the extra molding and seal material… testing a double lip gasket with a snap fit but i worry about tolerance stack after 500 door cycles.”
That is the real trade-off: a gasketed door adds molding, seal and test cost, but it is usually cheaper than re-tooling after the design freeze. The earlier you test the door cycle, the better.
What this means: design for end-user replacement unless you have a specific, documented reason to do otherwise.
Professional imaging, radiotherapy and IVD
The short answer: these may fall under Article 11(2), but only if the device matches the legal category and the Member State applies the exemption. Replacement is by an independent professional, not the end user.
The service model has to match the legal route. If you rely on Article 11(2), you need a professional service network, a service manual, a defined competence level and a safety rationale. “It is imaging” is not enough by itself; the device has to be a professional medical imaging or radiotherapy device within the meaning of the regulation. IVD devices need their own classification check.
What this means: Article 11(2) is plausible for this family, but it is a documentation and service-design route, not a shortcut.
Wearables and implantables
The short answer: wearables only qualify for the wet-use route if they are specifically designed to operate in a wet environment or to be washable or rinseable. Implantables are usually assessed under Article 11(3), but the Member State route and the MDR file still have to align.
An implantable battery is not end-user replaceable, so the practical question is not a battery door. It is the risk assessment, the permanent-connection rationale and the evidence that the exemption applies in the target country. Do not treat “implantable” as an automatic exemption; treat it as a product-specific argument that needs legal review.
What this means: category and route are separate questions. A device can be medical and still fall under the main end-user rule.
Table 2 — Device family matrix
| Device family | Likely category | Default route | Route to investigate | Key evidence |
|---|---|---|---|---|
| Ventilator / life support | Portable | End user | Article 11(3) if permanent connection is required | Risk assessment, Member State check, service procedure |
| Patient monitor | Portable | End user | Article 11(2) only if the device matches the category | Door design, IP test, instructions |
| Infusion pump | Portable | End user | Article 11(2) only in limited cases | Door design, instructions, spare-parts plan |
| Handheld ultrasound | Portable | End user | Article 11(2) if professional imaging device | Service model, safety rationale |
| Professional imaging / radiotherapy | Portable or industrial | Independent professional under 11(2) | Confirm device category and Member State application | Service manual, competence definition |
| IVD device | Portable or industrial | Depends on device | Article 11(2) or 11(3) | IVD classification, risk file |
| Wet-use wearable | Portable | End user | Article 11(2) if washable/rinseable | IP rating, cleaning validation |
| Implantable | Not end-user replaceable | Article 11(3) assessment | Confirm Member State application | Risk file, permanent-connection rationale |
What Evidence Should OEMs Prepare Before 18 February 2027?
The five-document pack
The short answer: prepare five documents: category rationale, route decision, ISO 14971 risk assessment, service/spare-parts plan, and QR/data package.
The category rationale records the pack weight, intended use and enclosure. The route decision records whether you rely on Article 11(1), 11(2) or 11(3), the exact criterion, the Member State check and the person who approved it. The risk assessment explains the safety or data-integrity rationale. The service plan defines who replaces the pack, with what tools, and how five-year availability is met. The QR/data package records the unique identifier, the resolver or persistent URL, the label data and the declaration of conformity link.
What this means: if you cannot explain the route on one page, you do not yet have a defensible position.
What to ask your battery supplier
The short answer: ask for pack-level evidence, not a compliance promise.
Ask for IEC 62133-2 / UL 2054 reports, a UN 38.3 summary and ISO 13485 certification. Ask for pack weight and dimensions, connector and SMBus data, the QR/marking area, change-notification terms and five-year supply. Ask who the economic operator for the battery is, and who signs the declaration of conformity.
Data ownership is the part that surprises teams. A battery passport practitioner put it plainly in a public r/batteries thread:
“most companies now understand what the passport is supposed to contain. The harder part is whether they can actually get the data from all the places it currently lives and keep it updated.”
The same question applies even when no passport is required: who owns each data point, where is the evidence, and who updates it when a supplier changes?
What this means: a supplier that can give you the data package is worth more than one that simply says “we are compliant.”
What TEFOO can and cannot do
The short answer: we can supply the pack, test evidence, BMS data, QR/marking support and enclosure/connector engineering support. The OEM remains the legal manufacturer of the device and the operator responsible for the appliance.
We can help you compare pack architectures, define the marking area, prepare the battery data package and plan change control. We do not sign the OEM’s declaration of conformity and we do not take over the OEM’s legal responsibility. That division is not a limitation; it is what makes the project work. The pack maker owns the pack evidence, and the device maker owns the device argument.
What this means: the fastest path is to split the work early, before the enclosure and the regulatory file diverge.
If you are selecting a pack for a 2027 medical device launch, send us the device profile, the target Member States, the battery category and the enclosure concept. We will return a pack specification, marking area, data package and change-control plan — and tell you which Article 11 questions your team still needs to answer.
This is an engineering summary, not legal advice. Check the latest implementing and delegated acts, and the Member State where the device is placed on the market, before freezing the design or the regulatory file.